- Controlled Fill Class I - pertains to soil, rock or other inert material that has been placed on site in a controlled fashion such that the average compacted density is 98% (no less than 95%) of the maximum dry density when tested in accordance with AS1289.5.1.1.
- Controlled Fill Class II - pertains to soil, rock or other inert material that has been placed on site in a controlled fashion such that the average compacted density is 95% (no less than 92%) of the maximum dry density when tested in accordance with AS1289.5.1.1.
- Uncontrolled fill - pertains to soil, rock or other inert material that has been placed on site without the compaction density as defined for either control fill.
- In-situ material - pertains to natural soil found on site.